Product Overview
Steel Structure Workshop is a metal workshop assembled using steel kits. Ideal for personal and professional use, it is an extremely robust and durable building that can effectively withstand harsh environments such as hurricanes and snow storms. And with a high degree of customisability, it can be designed in the way you need it. The steel workshop is pre-engineered and machined in the factory, and the finished kit is then delivered to its destination for bolting. This results in a significant reduction in both construction time and cost. Whatever your purpose, XGZ as a specialist steel building general contractor, our team can create the perfect workspace for you!
Product Parameters
tems |
Specification |
Main Steel Frame |
Column |
Q235, Q345 Welded H Section Steel |
Beam |
Q235, Q345 Welded H Section Steel |
Secondary Frame |
Purlin |
Q235 C and Z purlin |
Knee brace |
Q235 Angle Steel |
Tie rod |
Q235 Circular Steel Pipe |
Brace |
Q235 Round Bar |
Vertical&Horizontal support |
Q235 Angle Steel, Round Bar or Steel Pipe |
Cladding system |
Roof panel |
EPS Sandwich Panel / Glass Fiber Sandwich Panel / |
Rock Wool Sandwich Panel / Pu Sandwich Panel /Steel Sheet |
Wall panel |
same with roof panel |
Accessories |
Window |
Aluminium Alloy Window / PVC Window |
Door |
Sliding Sandwich Panel Door / Rolling Metal Door / Personal Door |
Rainspout |
PVC |
Live load on Roof |
In 50kg/Sqm (Color steel panel surrounded) |
Wind Resistance Grade |
according to local climate |
Earthquake-resistance |
8 Grades |
Structure Usage |
Up to 50 years |
Finishing Options |
Vast array of colors and type available |
Paint Options |
Alkyd painting, two primary painting, two finish painting |
(gray paint, red paint, white paint, epoxy zinc etc.) Or Galvanized. |
Product production process
- Prepare raw material:cut steel plate or utilize H-section steel, angle steel, round tube, square tube, etc. in an internation size;
- Shape and Welding:Make the required modifications to the web's perpendicularity and the parallelism of the flanges
- H-beam Straightener:Use a straightening machine to make the I-beams straight.
- Shot Blasting and Painting:Remove rust from the surface Then spray paint (customizable colors)
- Shipment:(1)Open top container(advantage:easy to load the steel;disadvantage:high shipping cost, aleak and few quantity); (2) Closed container with steel skid (advantage:save shipping cost,all members be packed together and reduce friction,the surface of steel members will be much better;save labor cost to unload the steel members).
Sales Service
A. If you have the drawings
We can provide you the full service of production, shipment and
Installation guide, which is high quality and low cost.Because we own all kinds of technical facilities, complete test instruments and advanced production processes.
B. No drawings
Our excellent design team will freely design the steel structure buildings for you.If you give us the following information, we will give you an satisfactory drawing.
1. Dimension:Length, width, ridge height, eave height, etc.
2. Doors and Windows:Dimension, quantity, installation position.
3. Local Climate:Wind load, snow load, roof load, Seismic load
4. Insulation materials:Insulated Sandwich panel or Single Steel Sheet
5. Crane beam:If you need it, it will be very helpful that you tell us its technological parameters.
6. Usage:If you tell us the application of light steel structure warehouse, we can exactly design the drawings or match suitable materials for you.
7. Other requirements:Such as fire proofing, transparent roof, etc.Please kindly inform us, too.
Packaging & Shipping
For Main steel Packing, there are 2 options:
FOR LOADING& UNLOADING Option 1- Packing and loaded with pallets.
1) The steel pallet bottom is made of H steel , which is strong and durable with good bearing capacity,
2) The bracings and accessories shall be tightly bound and placed on the upper side of the steel column and beam. The whole pallet shall be fastened with steel wire rope or packing belt, to avoid shake during transportation
3) After loading, the pallets are fixed in the corners of the container, prevents the components from colliding with each other inside the container and causes damage to the components or containers, and avoids other hidden costs.
4) 10 minutes to load and unload goods, save labor cost
5) Can use 40HC directly instead of 40OH, to save USD800-1200/set containers in sea freight
Option 2- Packing and loaded without pallet (In initial quotation we adopt)
1) Use when the steel qty not big and no Large scale unloading machinery in destination.
2)Need to use 40OH, can save USD1000 for pallet, but longer loading and unloading
3)Lay the binding rope on both sides and bottom of the container, and place the goods above the binding rope. After installation, use the tensioner to tighten the binding rope. The position where the binding rope contacts the box or goods shall be lined with wear-resistant materials (such as color coated plate corner protector) to prevent the rope from being worn.
4) The steel wire rope shall tensioned with a knotter to prevent the steel wire rope from loosening during transportation back of contianer
Detailed Photos
Certifications
Qingdao Xinguangzheng Steel Structure Co., Ltd, founded in 1997, is now the first steel structure listed company (New OTC Market) of Qingdao after a 20-year stable development. It is the group member unit of China Steel Structure Association; The member of China Construction Metal Structure Association; Committee unit of China Chamber of International Commerce, and is rated as Credit enterprise (class AAA) by Ministry of Commerce and
SASAC of PRC. It has also been listed into the Modern Production Base of Construction Industry in Shandong Province and has achieved the honor of famous mark of Shandong Province.
Due to its powerful technique and rich engineering experience, XGZ has achieved National Professional Contractors for steel structure projects (class A); Anti-water, anti-rust and thermal insulation; Architectural decoration; Professional Contractors for architectural curtain wall (Class B), EN1090 Certification (CE); Global normal steel structure advanced certificate (EXC-3). XGZ has now become a high-tech, diversified and export-oriented
Customer visit
XGZ have the Chinese Managing Qualification of external contractor for Construction by Chinese Ministry of Commerce, and has cooperated with B& R countries long before. We face European and American markets and seek for international development path; Our partners are from Canada, Australia, Germany, France, Brazil, England, America, etc., more than 80 countries all over the world.